Throughput is all production. That is, everything that makes it to finished goods.

Correct Answer

verifed

verified

Which of the following is not a way in which a workcenter can be organized?


A) According to function in a workcenter configuration
B) According to function in an assembly line
C) By product in assembly line
D) As a group technology cell (GT cell)
E) By product in a flow operation

Correct Answer

verifed

verified

The assignment method of job sequencing is a special case of the transportation method of linear programming.

Correct Answer

verifed

verified

Statistical fluctuation refers to the normal variation about a mean or average.

Correct Answer

verifed

verified

Which of the following is not an objective of workcenter scheduling?


A) Meeting due dates
B) Providing time for quality at the source
C) Minimizing setup time or cost
D) Minimizing work-in-process inventory
E) Minimizing lead time

Correct Answer

verifed

verified

The LCFS and Johnson's priority rules are basically the same except LCFS uses due dates as a major determiner of job sequence.

Correct Answer

verifed

verified

Assume you are sequencing jobs using Johnson's rule. A particular job requires 7 hours to assemble and then is followed by 8 hours in the painting department. Which of the following is where you would schedule this job?


A) As early as possible in the unfilled job sequence.
B) As late as possible in the unfilled job sequence.
C) The schedule would depend on the due date.
D) Does not matter.
E) Johnson's Rule does not apply.

Correct Answer

verifed

verified

One of the principles of workcenter scheduling is that once started, a job should not be interrupted.

Correct Answer

verifed

verified

The effects of statistical variations in processing times in a dependent sequence will eventually cancel themselves out due to the law of averages.

Correct Answer

verifed

verified

The "dollar days" inventory measurement can be used in purchasing to discourage large work-in-process and producing earlier than is needed.

Correct Answer

verifed

verified

In this type of production, the typical scheduling approach is infinite, forward scheduling of jobs: usually labor-limited, but certain functions may be machine-limited (a heat-treating process or a precision machining center, for example) ; priorities determined by MRP due dates.


A) Projects
B) Mid-volume manufacturing
C) Continuous processes
D) Low-volume workcenters
E) High-volume manufacturing

Correct Answer

verifed

verified

According to the theory of constraints, which of the following can be a CCR?


A) Factory layout
B) Product design
C) An employee
D) A customer
E) Sales literature

Correct Answer

verifed

verified

For a high-volume type of manufacturing, which of the following is the typical production scheduling approach?


A) Finite backward scheduling
B) Finite forward scheduling
C) Infinite forward scheduling
D) Infinite backward scheduling
E) Assignment method

Correct Answer

verifed

verified

For a mid-volume type of manufacturing, which of the following is the typical production scheduling approach?


A) Finite forward scheduling
B) Finite backward scheduling
C) Infinite forward scheduling
D) Infinite backward scheduling
E) Precision forward scheduling

Correct Answer

verifed

verified

Johnson's rule, a priority rule used in sequencing production jobs, is used only in production situations where we are dealing with one machine or one stage of production activity.

Correct Answer

verifed

verified

Looking at the loads that are placed on each resource by the products that are scheduled through them is called process flow profiling.

Correct Answer

verifed

verified

One of the principles of workcenter scheduling is to match workcenter input information to what the worker can actually do.

Correct Answer

verifed

verified

Which of the following is a tool of shop-floor control?


A) The hours worked per employee report
B) The anticipated delay report
C) The permanent work-in-process report
D) Time and motion studies
E) Product and process control report

Correct Answer

verifed

verified

According to the theory of constraints, which of the following is an operational measurement that can be used to measure the firm's ability to make money?


A) Net profit
B) Throughput
C) Return on investment
D) Sales
E) Direct labor hours

Correct Answer

verifed

verified

Using the random order or "whim" priority rule to sequence production jobs means that supervisors or operators select whichever job they feel like running.

Correct Answer

verifed

verified

Showing 81 - 100 of 125