Correct Answer
verified
Multiple Choice
A) 0.0129
B) 10.875
C) 0.0435
D) 3.29
Correct Answer
verified
Multiple Choice
A) cost reduction
B) leadership involvement
C) employee empowerment
D) continuous improvement
Correct Answer
verified
True/False
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) aesthetic.
B) performance.
C) features.
D) perceived quality.
Correct Answer
verified
Short Answer
Correct Answer
verified
View Answer
Multiple Choice
A) 1.00
B) 1.33
C) 1.75
D) 2.00
Correct Answer
verified
Multiple Choice
A) The process is in control using either three-sigma or two-sigma limits.
B) The process is in control if three-sigma limits are used but out of control if two-sigma limits are used.
C) The process is in control if two-sigma limits are used but out of control if three-sigma limits are used.
D) The process is out of control using either three-sigma control limits or two-sigma control limits.
Correct Answer
verified
Short Answer
Correct Answer
verified
Multiple Choice
A) use statistical methods to determine the workers responsible for poor quality.
B) break down barriers between departments.
C) the customer is always right,so design your system to please them.
D) plan your work and work your plan.
Correct Answer
verified
Essay
Correct Answer
verified
View Answer
True/False
Correct Answer
verified
Multiple Choice
A) Failure costs dictate the shape of the total cost curve.
B) In general,appraisal costs exceed prevention costs.
C) As the defect rate increases,appraisal costs increase.
D) As the defect rate increases,prevention costs increase.
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) external failure costs.
B) internal failure costs.
C) appraisal costs.
D) prevention costs.
Correct Answer
verified
Multiple Choice
A) parts per million.
B) losses.
C) lot tolerance percent defective.
D) acceptable quality levels.
Correct Answer
verified
Multiple Choice
A) 0.0002,0.0001
B) 0.0142,0.0058
C) 0.1127,0.0873
D) 0.0023,0.0000
Correct Answer
verified
True/False
Correct Answer
verified
Multiple Choice
A) quality assurance.
B) statistical quality control.
C) quality function deployment.
D) continuous improvement.
Correct Answer
verified
Showing 21 - 40 of 58
Related Exams