A hospital's layout most closely resembles which of the following?


A) product oriented
B) work cell
C) job shop
D) project
E) retail

Correct Answer

verifed

verified

A facility is trying to set up an assembly line,and has identified the various tasks,and their relationship to each other,as shown in the following table.Managers wish to produce 600 units per day,working two 8-hour shifts. A facility is trying to set up an assembly line,and has identified the various tasks,and their relationship to each other,as shown in the following table.Managers wish to produce 600 units per day,working two 8-hour shifts.    (a)Draw a network diagram of precedence relationships. (b)Compute the required cycle time per unit in seconds. (c)Compute the minimum number of workstations required to produce 600 units per day. (d)Balance this line using the longest processing time heuristic. (e)What is the efficiency of the line obtained in part (d)? (a)Draw a network diagram of precedence relationships. (b)Compute the required cycle time per unit in seconds. (c)Compute the minimum number of workstations required to produce 600 units per day. (d)Balance this line using the longest processing time heuristic. (e)What is the efficiency of the line obtained in part (d)?

Correct Answer

verifed

verified

(a)The precedence diagram appears below....

View Answer

A product requires 24 separate tasks,and the sum of those task times is 14 minutes.If the cycle time is 2 minutes,then at least 12 workstations will be needed.

Correct Answer

verifed

verified

Retail layouts are based on the notion that:


A) handling costs should be minimized.
B) storage costs should be minimized.
C) average customer visit duration should be maximized.
D) space used should be minimized.
E) maximizing customer exposure rate maximizes sales and profit.

Correct Answer

verifed

verified

Cycle time is the maximum time that the product is allowed at each workstation.

Correct Answer

verifed

verified

A(n)________ is a special product-oriented arrangement of machines and personnel in what is ordinarily a process-oriented facility.

Correct Answer

verifed

verified

What are the advantages and disadvantages of product-oriented layouts?

Correct Answer

verifed

verified

The advantages of a product-oriented lay...

View Answer

Hemo-tech,Inc.,a biomedical technology and research laboratory,produces a standard blood filtering device on an assembly-line basis.Six basic tasks are performed along the assembly line.The time to perform each task and the tasks that must immediately precede each task are in the table below.Twenty pumps per 450-minute day must be produced by the assembly line. Hemo-tech,Inc.,a biomedical technology and research laboratory,produces a standard blood filtering device on an assembly-line basis.Six basic tasks are performed along the assembly line.The time to perform each task and the tasks that must immediately precede each task are in the table below.Twenty pumps per 450-minute day must be produced by the assembly line.    (a)Draw the network diagram of the precedence relationships. (b)Identify the absolute minimum and maximum cycle times. (c)What is the cycle time required to meet demand? (d)What is the minimum number of workstations required to meet the schedule? (e)Balance this line using the most following tasks heuristic. (f)What is the efficiency of the line obtained in part (e)? (g)Can the efficiency of this solution be improved? Explain. (a)Draw the network diagram of the precedence relationships. (b)Identify the absolute minimum and maximum cycle times. (c)What is the cycle time required to meet demand? (d)What is the minimum number of workstations required to meet the schedule? (e)Balance this line using the most following tasks heuristic. (f)What is the efficiency of the line obtained in part (e)? (g)Can the efficiency of this solution be improved? Explain.

Correct Answer

verifed

verified

(a)The appropriate diagram appears below...

View Answer

The work cell layout,a special arrangement of machinery and personnel to focus on the production of a single product or group of related products,is for manufacturing applications and has no relevance to services.

Correct Answer

verifed

verified

The assumptions necessary for a successful product-oriented layout include all EXCEPT which of the following?


A) adequate volume for high equipment utilization
B) standardized product
C) volatile product demand
D) adequately standardized supplies of raw materials and components
E) All of the above are appropriate assumptions.

Correct Answer

verifed

verified

In the office relationship chart,which rating reflects the highest importance for two departments' closeness to each other?


A) A
B) E
C) I
D) O
E) X

Correct Answer

verifed

verified

________ is the use of computer software to evaluate the profitability of merchandising plans in a retail layout.

Correct Answer

verifed

verified

The main issue in designing process-oriented layouts concerns the relative positioning of:


A) safety devices.
B) departments or work centers.
C) raw materials.
D) entrances,loading docks,etc.
E) supervisors to their employees.

Correct Answer

verifed

verified

What are the advantages of focused factories?

Correct Answer

verifed

verified

Focused factories are better a...

View Answer

________ layouts deal with low-volume,high-variety production with like machines and equipment grouped together.

Correct Answer

verifed

verified

A production line is to be designed for a job with four tasks.The task times are 2.4 minutes,1.4 minutes,0.9 minutes,and 1.7 minutes.After line balancing,the largest possible assigned cycle time is ________ minutes,and the smallest possible assigned cycle time is ________ minutes.


A) 1.8; 1.4
B) 1.6; 0.9
C) 6.4; 2.4
D) 2.4; 0.9
E) 6.4; 0.9

Correct Answer

verifed

verified

A company is designing a product layout for a new product.It plans to use this production line eight hours a day in order to meet a schedule of 400 units per day.The tasks necessary to produce this product are detailed in the table below. A company is designing a product layout for a new product.It plans to use this production line eight hours a day in order to meet a schedule of 400 units per day.The tasks necessary to produce this product are detailed in the table below.    a.Draw the network described in the table. b.Without regard to a production schedule,what is the minimum possible cycle time (in seconds)for this situation; what is the maximum? c.What is the required cycle time (in seconds)in order to meet the schedule? d.What is the theoretical minimum number of workstations needed to meet the schedule? e.Balance this line using longest processing time. f.What is the efficiency of the balance obtained in part e? a.Draw the network described in the table. b.Without regard to a production schedule,what is the minimum possible cycle time (in seconds)for this situation; what is the maximum? c.What is the required cycle time (in seconds)in order to meet the schedule? d.What is the theoretical minimum number of workstations needed to meet the schedule? e.Balance this line using longest processing time. f.What is the efficiency of the balance obtained in part e?

Correct Answer

verifed

verified

The network diagram appears below.Minimu...

View Answer

One guideline for a retail layout is to locate high-draw items around the periphery of the store.

Correct Answer

verifed

verified

The objective of layout strategy is to:


A) minimize cost.
B) develop an effective and efficient layout that will meet the firm's competitive requirements.
C) maximize flexibility.
D) minimize space used.
E) maximize worker satisfaction.

Correct Answer

verifed

verified

The layout approach that addresses trade-offs between space and material handling is called the fixed-position layout.

Correct Answer

verifed

verified

Showing 61 - 80 of 146